Back to trial

NCT00099437

Comparison of Fulvestrant (FASLODEX™) 250 mg and 500 mg in Postmenopausal Women With Oestrogen Receptor Positive Advanced Breast Cancer Progressing or Relapsing After Previous Endocrine Therapy.

Version 66 to 67 · AstraZeneca

Patch inspector

Version 66 to 67

4 operations 2 path groups ctgov_internal_history
ClinicalTrials.gov
Severity is deterministic uncalibrated triage metadata, not validated review priority. Operation-level severity is inferred from deterministic path rules. Rule matches shown per operation are approximate previews (they skip the pipeline's suppression passes); the authoritative classification is the stored event record.
Plain-language summary

Manual review pending.

Rules fired

None recorded.

Value signals
[
  {
    "path": "/protocolSection/statusModule/completionDateStruct/date",
    "signal": "timeline_significant_shift",
    "category": "timeline_significant_shift",
    "new_type": "ESTIMATED",
    "old_type": "ESTIMATED",
    "severity": "medium",
    "direction": "later",
    "new_value": "2026-12-31",
    "old_value": "2025-12-31",
    "delta_days": 365,
    "date_struct": "completionDateStruct",
    "new_precision": "day",
    "old_precision": "day"
  }
]
Provenance
Source
ctgov_internal_history
Fetched
2026-06-18 19:00:16+00
Raw hash
63317953551016be6d280c0bf7ad43879f1986e09221b111076205c508dcbb34
Payload
Source URL
Timeline Start, primary completion, and completion date movement. Triage: Medium 1 ops
replace /protocolSection/statusModule/completionDateStruct/date
Triage: Medium
Timeline Shift Operation 2
Matched rules
  • completion_timeline_change Completion date changes are operational timeline signals.
Before
2025-12-31
After
2026-12-31
Other registry fields Changes outside the current high-signal rule families. Triage: Uncategorized 3 ops
replace /protocolSection/statusModule/statusVerifiedDate
Triage: Uncategorized
Uncategorized Operation 1
Before
2025-09
After
2026-01
replace /protocolSection/statusModule/lastUpdateSubmitDate
Triage: Uncategorized
Uncategorized Operation 3
Before
2025-09-19
After
2026-02-26
replace /protocolSection/statusModule/lastUpdatePostDateStruct/date
Triage: Uncategorized
Uncategorized Operation 4
Before
2025-09-24
After
2026-03-18
Raw JSON Patch
[
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/statusVerifiedDate",
    "value": "2026-01"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/completionDateStruct/date",
    "value": "2026-12-31"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdateSubmitDate",
    "value": "2026-02-26"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdatePostDateStruct/date",
    "value": "2026-03-18"
  }
]