Back to trial

NCT03584009

A Phase II Study Comparing The Efficacy Of Venetoclax + Fulvestrant Vs. Fulvestrant In Women With Estrogen Receptor-Positive, Her2-Negative Locally Advanced Or Metastatic Breast Cancer Who Experienced Disease Recurrence Or Progression During Or After CDK4/6 Inhibitor Therapy

Version 21 to 22 · Hoffmann-La Roche

Patch inspector

Version 21 to 22

6 operations 3 path groups ctgov_internal_history
ClinicalTrials.gov
Severity is deterministic uncalibrated triage metadata, not validated review priority. Operation-level severity is inferred from deterministic path rules. Rule matches shown per operation are approximate previews (they skip the pipeline's suppression passes); the authoritative classification is the stored event record.
Plain-language summary

Manual review pending.

Rules fired

None recorded.

Value signals
[
  {
    "path": "/protocolSection/statusModule/completionDateStruct/date",
    "signal": "timeline_actualized_earlier",
    "category": "timeline_actualized_earlier",
    "new_type": "ACTUAL",
    "old_type": "ESTIMATED",
    "severity": "low",
    "direction": "earlier",
    "new_value": "2021-05-06",
    "old_value": "2022-02-05",
    "delta_days": 275,
    "date_struct": "completionDateStruct",
    "new_precision": "day",
    "old_precision": "day"
  }
]
Provenance
Source
ctgov_internal_history
Fetched
2026-06-18 18:59:51+00
Raw hash
9da2e318fda54457063503d89b991b81676b1b50ea364f9937b28eda4c2effbc
Payload
Source URL
Timeline Start, primary completion, and completion date movement. Triage: Medium 2 ops
replace /protocolSection/statusModule/completionDateStruct/date
Triage: Medium
Timeline Shift Operation 3
Matched rules
  • completion_timeline_change Completion date changes are operational timeline signals.
Before
2022-02-05
After
2021-05-06
replace /protocolSection/statusModule/completionDateStruct/type
Triage: Medium
Timeline Shift Operation 4
Matched rules
  • completion_timeline_change Completion date changes are operational timeline signals.
Before
ESTIMATED
After
ACTUAL
Other registry fields Changes outside the current high-signal rule families. Triage: Uncategorized 3 ops
replace /protocolSection/statusModule/statusVerifiedDate
Triage: Uncategorized
Uncategorized Operation 1
Before
2021-05
After
2021-06
replace /protocolSection/statusModule/lastUpdateSubmitDate
Triage: Uncategorized
Uncategorized Operation 5
Before
2021-05-04
After
2021-06-10
replace /protocolSection/statusModule/lastUpdatePostDateStruct/date
Triage: Uncategorized
Uncategorized Operation 6
Before
2021-05-05
After
2021-06-11
Status and stopping reason Recruitment status, termination, suspension, withdrawal, or why-stopped text. Triage: Uncategorized 1 ops
replace /protocolSection/statusModule/overallStatus
Triage: Uncategorized
Uncategorized Operation 2
Before
ACTIVE_NOT_RECRUITING
After
COMPLETED
Raw JSON Patch
[
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/statusVerifiedDate",
    "value": "2021-06"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/overallStatus",
    "value": "COMPLETED"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/completionDateStruct/date",
    "value": "2021-05-06"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/completionDateStruct/type",
    "value": "ACTUAL"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdateSubmitDate",
    "value": "2021-06-10"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdatePostDateStruct/date",
    "value": "2021-06-11"
  }
]