Back to trial

NCT05415215

A Study to Evaluate Patient Preference for Home Administration of Fixed-Dose Combination of Pertuzumab and Trastuzumab for Subcutaneous Administration in Participants With Early or Locally Advanced/Inflammatory HER2-Positive Breast Cancer

Version 28 to 29 · Hoffmann-La Roche

Patch inspector

Version 28 to 29

10 operations 6 path groups ctgov_internal_history
ClinicalTrials.gov
Severity is deterministic uncalibrated triage metadata, not validated review priority. Operation-level severity is inferred from deterministic path rules. Rule matches shown per operation are approximate previews (they skip the pipeline's suppression passes); the authoritative classification is the stored event record.
Plain-language summary

Manual review pending.

Rules fired
enrollment_count_change
Value signals
[
  {
    "path": "/protocolSection/statusModule/completionDateStruct/date",
    "signal": "timeline_actualized_earlier",
    "category": "timeline_actualized_earlier",
    "new_type": "ACTUAL",
    "old_type": "ESTIMATED",
    "severity": "low",
    "direction": "earlier",
    "new_value": "2025-11-07",
    "old_value": "2025-12-31",
    "delta_days": 54,
    "date_struct": "completionDateStruct",
    "new_precision": "day",
    "old_precision": "day"
  }
]
Provenance
Source
ctgov_internal_history
Fetched
2026-06-18 18:59:05+00
Raw hash
fc82ed702f5b80531533f609eb9b0844583246937146ef2ed6ea3bf5edd18a02
Payload
Source URL
Design Trial model, phase, allocation, masking, arms, or interventions. Triage: High 1 ops
replace /protocolSection/designModule/enrollmentInfo/count
Triage: High
Enrollment Change Operation 9
Matched rules
  • enrollment_count_change Enrollment count changes can signal scope or feasibility shifts.
Before
347
After
346
Timeline Start, primary completion, and completion date movement. Triage: Medium 2 ops
replace /protocolSection/statusModule/completionDateStruct/date
Triage: Medium
Timeline Shift Operation 5
Matched rules
  • completion_timeline_change Completion date changes are operational timeline signals.
Before
2025-12-31
After
2025-11-07
replace /protocolSection/statusModule/completionDateStruct/type
Triage: Medium
Timeline Shift Operation 6
Matched rules
  • completion_timeline_change Completion date changes are operational timeline signals.
Before
ESTIMATED
After
ACTUAL
Contacts and locations Site, contact, and location updates that are usually operational. Triage: Uncategorized 1 ops
replace /protocolSection/contactsLocationsModule/locations/25/facility
Triage: Uncategorized
Uncategorized Operation 10
Before
Aga Khan University Hospital
After
The Aga Khan University-Kenya.
Other registry fields Changes outside the current high-signal rule families. Triage: Uncategorized 3 ops
replace /protocolSection/statusModule/statusVerifiedDate
Triage: Uncategorized
Uncategorized Operation 3
Before
2025-08
After
2025-11
replace /protocolSection/statusModule/lastUpdateSubmitDate
Triage: Uncategorized
Uncategorized Operation 7
Before
2025-08-12
After
2025-11-10
replace /protocolSection/statusModule/lastUpdatePostDateStruct/date
Triage: Uncategorized
Uncategorized Operation 8
Before
2025-08-13
After
2025-11-12
Sponsor and administrative fields Sponsor, collaborator, oversight, or registry maintenance changes. Triage: Uncategorized 2 ops
replace /protocolSection/identificationModule/secondaryIdInfos/1/type
Triage: Uncategorized
Uncategorized Operation 1
Before
REGISTRY
After
CTIS
remove /protocolSection/identificationModule/secondaryIdInfos/1/domain
Triage: Uncategorized
Uncategorized Operation 2
Before
EU CT Number
Status and stopping reason Recruitment status, termination, suspension, withdrawal, or why-stopped text. Triage: Uncategorized 1 ops
replace /protocolSection/statusModule/overallStatus
Triage: Uncategorized
Uncategorized Operation 4
Before
ACTIVE_NOT_RECRUITING
After
COMPLETED
Raw JSON Patch
[
  {
    "op": "replace",
    "path": "/protocolSection/identificationModule/secondaryIdInfos/1/type",
    "value": "CTIS"
  },
  {
    "op": "remove",
    "path": "/protocolSection/identificationModule/secondaryIdInfos/1/domain"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/statusVerifiedDate",
    "value": "2025-11"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/overallStatus",
    "value": "COMPLETED"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/completionDateStruct/date",
    "value": "2025-11-07"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/completionDateStruct/type",
    "value": "ACTUAL"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdateSubmitDate",
    "value": "2025-11-10"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdatePostDateStruct/date",
    "value": "2025-11-12"
  },
  {
    "op": "replace",
    "path": "/protocolSection/designModule/enrollmentInfo/count",
    "value": 346
  },
  {
    "op": "replace",
    "path": "/protocolSection/contactsLocationsModule/locations/25/facility",
    "value": "The Aga Khan University-Kenya."
  }
]