Back to trial

NCT05860465

Safety and Efficacy of SPH4336 in Combination With Endocrine Therapy in the Treatment of Locally Advanced or Metastatic Breast Cancer

Version 1 to 2 · Shanghai Pharmaceuticals Holding Co., Ltd

Patch inspector

Version 1 to 2

3 operations 2 path groups ctgov_internal_history
ClinicalTrials.gov
Severity is deterministic uncalibrated triage metadata, not validated review priority. Operation-level severity is inferred from deterministic path rules. Rule matches shown per operation are approximate previews (they skip the pipeline's suppression passes); the authoritative classification is the stored event record.
Plain-language summary

Manual review pending.

Rules fired

None recorded.

Value signals
[
  {
    "path": "/protocolSection/statusModule/startDateStruct/date",
    "signal": "timeline_significant_shift",
    "category": "timeline_significant_shift",
    "new_type": "ESTIMATED",
    "old_type": "ESTIMATED",
    "severity": "medium",
    "direction": "later",
    "new_value": "2023-10-01",
    "old_value": "2023-07-01",
    "delta_days": 92,
    "date_struct": "startDateStruct",
    "new_precision": "day",
    "old_precision": "day"
  }
]
Provenance
Source
ctgov_internal_history
Fetched
2026-06-18 19:15:17+00
Raw hash
f3c6ef49796ec4f1745dabd7da60b907b167827eb3044253caa6061c18a38e3b
Payload
Source URL
Timeline Start, primary completion, and completion date movement. Triage: Medium 1 ops
replace /protocolSection/statusModule/startDateStruct/date
Triage: Medium
Timeline Shift Operation 1
Matched rules
  • start_timeline_change Start date changes are operational timeline signals.
Before
2023-07-01
After
2023-10-01
Other registry fields Changes outside the current high-signal rule families. Triage: Uncategorized 2 ops
replace /protocolSection/statusModule/lastUpdateSubmitDate
Triage: Uncategorized
Uncategorized Operation 2
Before
2023-06-19
After
2023-08-23
replace /protocolSection/statusModule/lastUpdatePostDateStruct/date
Triage: Uncategorized
Uncategorized Operation 3
Before
2023-06-22
After
2023-08-25
Raw JSON Patch
[
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/startDateStruct/date",
    "value": "2023-10-01"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdateSubmitDate",
    "value": "2023-08-23"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdatePostDateStruct/date",
    "value": "2023-08-25"
  }
]