Back to trial

NCT04224272

A Study of ZW25 (Zanidatamab) With Palbociclib Plus Fulvestrant in Patients With HER2+/HR+ Advanced Breast Cancer

Version 19 to 20 · Jazz Pharmaceuticals

Patch inspector

Version 19 to 20

5 operations 3 path groups ctgov_internal_history
ClinicalTrials.gov
Severity is deterministic uncalibrated triage metadata, not validated review priority. Operation-level severity is inferred from deterministic path rules. Rule matches shown per operation are approximate previews (they skip the pipeline's suppression passes); the authoritative classification is the stored event record.
Plain-language summary

Manual review pending.

Rules fired

None recorded.

Value signals
[
  {
    "path": "/protocolSection/statusModule/completionDateStruct/type",
    "signal": "milestone_realized",
    "category": "milestone_realized",
    "new_date": "2025-06-30",
    "new_type": "ACTUAL",
    "old_date": "2025-06-30",
    "old_type": "ESTIMATED",
    "severity": "low",
    "delta_days": 0,
    "date_struct": "completionDateStruct"
  }
]
Provenance
Source
ctgov_internal_history
Fetched
2026-06-18 18:58:09+00
Raw hash
a0edfda1c129ea65f511e1d916341b15e7117b48e45cbc9e00630f7b76747fd3
Payload
Source URL
Timeline Start, primary completion, and completion date movement. Triage: Medium 1 ops
replace /protocolSection/statusModule/completionDateStruct/type
Triage: Medium
Timeline Shift Operation 3
Matched rules
  • completion_timeline_change Completion date changes are operational timeline signals.
Before
ESTIMATED
After
ACTUAL
Other registry fields Changes outside the current high-signal rule families. Triage: Uncategorized 3 ops
replace /protocolSection/statusModule/statusVerifiedDate
Triage: Uncategorized
Uncategorized Operation 1
Before
2025-05
After
2025-07
replace /protocolSection/statusModule/lastUpdateSubmitDate
Triage: Uncategorized
Uncategorized Operation 4
Before
2025-05-20
After
2025-07-22
replace /protocolSection/statusModule/lastUpdatePostDateStruct/date
Triage: Uncategorized
Uncategorized Operation 5
Before
2025-05-29
After
2025-08-01
Status and stopping reason Recruitment status, termination, suspension, withdrawal, or why-stopped text. Triage: Uncategorized 1 ops
replace /protocolSection/statusModule/overallStatus
Triage: Uncategorized
Uncategorized Operation 2
Before
ACTIVE_NOT_RECRUITING
After
COMPLETED
Raw JSON Patch
[
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/statusVerifiedDate",
    "value": "2025-07"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/overallStatus",
    "value": "COMPLETED"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/completionDateStruct/type",
    "value": "ACTUAL"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdateSubmitDate",
    "value": "2025-07-22"
  },
  {
    "op": "replace",
    "path": "/protocolSection/statusModule/lastUpdatePostDateStruct/date",
    "value": "2025-08-01"
  }
]